Recently Completed
Project Name |
Project Overview |
Completion Date |
---|---|---|
Saddleback Ranch Traffic Enhancements | This project provided traffic calming improvements such as re-striping, corner bulb-outs, medians, and parkway landscaping on Saddleback Ranch Road in the vicinity of Portola Hills Elementary school. Saddleback Ranch Road Concept Plan Saddleback Ranch Road Traffic Calming Project |
Spring 2016 |
Regional Traffic Signal Synchronization (TSSP) | The project included the synchronization of traffic signals across multi-jurisdictional boundaries along 5 major arterial roadways in the City. There are 3 additional roadways currently underway. Jeronimo Road Lake Forest Drive Los Alisos Boulevard Santa Margarita Parkway Trabuco Road |
Fall 2015 Spring 2015 Winter 2014 Fall 2015 Summer 2015 |
Signalized Intersection at Rancho Parkway and Sports Park Access Road | This project constructed a signalized intersection on Rancho Pkwy. at the Sports Park access road to serve the City's Sports Park and the adjacent development north of the Park. | April 2015 |
ADA Ramp Improvements- Phase 7 | Phase 7 construction reconstructed 39 existing ADA compliant ramps in the neighborhoods around Lake Forest Drive, from Pittsford to Regency Lane. | Spring 2015 |
Lake Forest Sports Park and Recreation Center (PDF) | Development of an 86-acre sports park and recreation center located on the corner of Rancho Parkway and Portola Parkway (28000 Rancho Parkway). | November 2014 |
Annual Sports Field Renovations and Rye Seeding (PDF) | City park and turf renovations are performed annually. | Varies |
Bake Parkway Resurfacing-Completed (PDF) | The project replaced deteriorated pavement on Bake Parkway between Portola Parkway and Lake Forest Drive. | Fall 2014 |
Slurry Seal on the Streets of Foothill Ranch (PDF) | The annual project performed street repairs on residential streets in Foothill Ranch. | Fall 2014 |
Contact Us
-
Thomas Wheeler, P.E.
Director of Public Works/City Engineer
Email
Phone: (949) 461-3480
Fax: (949) 461-3511
Angel Fuertes, P.E.
Assistant City Engineer/Engineering Manager
Email
Phone: (949) 461-3490
Dave Rogers, P.E., T.E.
Traffic Engineer Manager
Email
Phone: (949) 461-3485
Douglas Erdman, P.E.
Principal Civil Engineer
Email
Phone: (949) 282-5233